Below is a list of projects I have worked on in the past.

This list is not complete and exhaustive, but only references the major projects.

Besides the mentioned projects I have worked on or have assisted on smaller assignments not mentioned here. 

 

Please klik the + sign to view the detailed descriptions.

(Disclaimer: All the mentioned names and references are registered with their respective owners.)

 

Project: Alarm Rationalisation

Role: Senior Alarm Management Consultant

Duration: February 2018 – February 2018

Project Description: QAFAC is implementing alarm management and wants to improve their alarm rates by rationalising their bad actor alarms.

Project Contribution: As Senior Alarm Management Consultant, I work with the QAFAC operations management and operations engineers to define and design a suitable alarm philosophy document for QAFAC and implement this alarm philosophy document by performing alarm rationalization on their bad actor alarms and decide on a way forward to reduce the alarms. Daily sessions over multiple weeks have been organized to fully rationalize the QAFAC Process Control Systems.

One remark from the customer was very pleasant for me. During the evaluation of the project I asked for a feedback on the expectations and the outcome of the project. The customer replied that I was the first consultant he had worked with, who could inform about how and why to use the provided alarm management solution. So far he had only seen engineers who could explain which button to press to get something done, but the reason why and what is the best way to do it, were never properly answered.

 

 

Project: Alarm Rationalisation

Role: Senior Alarm Management Consultant

Duration: September 2017 – on going

Project Description: Ashland ISP is improving their alarm rates by rationalising their bad actor alarms.

Project Contribution: As Senior Alarm Management Consultant, I work with the engineers and operators at Ashland ISP to discuss their bad actor alarms and decide on a way forward to reduce the alarms. Multiple days sessions are scheduled at irregular intervals to work the latest list of bad actor alarms.

 

 

Project: Alarm Rationalisation

Role: Senior Alarm Management Consultant

Duration: May 2017 – on going

Project Description: Covestro is improving their alarm rates by rationalising their bad actor alarms.

Project Contribution: As Senior Alarm Management Consultant, I work with the engineers and operators at Covestro to discuss their bad actor alarms and decide on a way forward to reduce the alarms. Multiple days sessions are scheduled at irregular intervals to work the latest list of bad actor alarms.

 

 

Project: Alarm Rationalisation

Role: Senior Alarm Management Consultant

Duration: April 2017 – on going

Project Description: Evonik is improving their alarm rates by rationalising their bad actor alarms.

Project Contribution: As Senior Alarm Management Consultant, I work with the engineers and operators at Evonik to discuss their bad actor alarms and decide on a way forward to reduce the alarms. Multiple days sessions are scheduled at irregular intervals to work the latest list of bad actor alarms.

 

 

Project: RLDC Zellik

Role: Senior Project Manager ICT

Duration: March 2017 – January-2018

Project Description: Euro Pool System is supplying the fresh food market with packaging crates, to be used in the transport of fresh good from the producers to the supermarkets. These crates are owned by Euro Pool System and Euro Pool System is managing the logistic processes to move crates to the producers, to the distribution centres, to the supermarkets and finally returning the crates to the Euro Pool System depots for cleaning, including applicable track and trace functions on crate level (total 80 million crates circulate through Europe each year). Each crate represents a packaging deposit value, hence moving the crates through the food chain, means moving the equivalent packaging deposit values backwards through the chain.

The RLDC Zellik project involves the creation and modification of Process Level, MES level and ERP level systems, including interfacing and middleware solutions like SAP Pro. The project includes enhanced returned goods processing, hence the applicable processes and systems had to be enhanced to cover this additional functionality.

Project Contribution: As ICT Project Manager, I manage the team of Business Analysts, Software Developers and SAP Pro Consultants involved in designing, developing, documenting and testing all relevant ICT systems. The project has a fixed delivery date with a penalty for late delivery. The project has been delivered on time and within budget.

 

 

Project: Business Development Alarm Management

Role: Senior Alarm Management Consultant

Duration: May – July 2016

Project Description: Yokogawa Europe Solutions wants to improve in alarm management solutions and alarm management consultancy.

Project Contribution: Working with the Yokogawa alarm management consultant, I created the value proposition for the various users of the Yokogawa alarm management solutions and designed an appropriate presentation pack and sales portfolio to be presented to customers.

 

 

Project: Jazan Integrated Gasification Combined Cycle.

Role: Advanced Solutions (MES) Consultant.

Duration: November 2014 – August 2015.

Project Description: Saudi Aramco constructs a 400 MBD grassroots refinery and hydrocarbon terminal facilities within JAZAN Economic City (JEC), In conjunction with the refinery project, a world scale integrated Gasification Combined Cycle (IGCC) plant is build which will generate 2.4 GW of net power to the grid. The Feed to the IGCC plant will be primarily vacuum residue (VR) from Jazan Refinery or imported High Sulfur Fuel Oil (HSFO). The Jazan IGCC complex will be integrated with the Jazan Refinery facilities to maximize the benefit from the investment.

Project Contribution: Honeywell has been selected as the main automation vendor for the Jazan IGCC project. My role within this project was to assure a consistent MES solution was provided throughout the project through an integrated approach of the various “Advanced Solutions” packages. (like: OSIsoft PI, Honeywell Alarm & Operations Management, Honeywell Asset Management, Honeywell Field Advisor, Honeywell On-line Refinery Instruction Manual System, Honeywell Procedural Operations). The consistent MES solution approach was achieved by aligning the MES solutions presented by the various project teams, to create a consistent approach and presentation.

Challenging in this project was the fact that a total of 6 EPC’s participated in the construction of these facilities, which meant a lot of extra discussions and alignment of the requirements and suggested solutions.

 

 

{slider Client: Lundin Edvard Grieg, Norway}

Project: Alarm Management implementation.

Role: Alarm Management  and MES Consultant.

Duration:  January 2014 – August 2015.

Project Description:  Honeywell was awarded the project to deliver an process historian and alarm management solution.

Project Contribution: My role within this project was to lead the implementation of the process historian and the alarm management solution.

 

 

{slider Client: Sonara, Cameroon.}

Project: Alarm Management implementation.

Role: Alarm Management Consultant.

Duration:  July 2014 – July 2015.

Project Description:  Sonara Operations Team was suffering from too many alarms during their normal operations. Honeywell was awarded the project to deliver an alarm management solution.

Project Contribution: My role within this project was to investigate the problem, create an alarm philosophy, design a solution fit for Sonara, get management Buy-In, lead the implementation of the alarm management solution and train the Sonara personnel to use the alarm management solution to improve their operations.

 

 

Project: Alarm Philosophy Workshop

Role: Alarm Management Consultant

Duration: Jan 2015 – Jan 2015.

Project Description: Qafco wished to implement alarm management. As a first step an alarm philosophy has been created.

Project Contribution: As alarm management consultant I sat down with the customer and created an alarm philosophy document which fit the Qafco way of working. Qafco can now implement alarm management using the created alarm philosophy document.

 

Project: Alarm Philosophy and Alarm Rationalization Workshop

Role: Alarm Management Consultant

Duration: Jan 2015 – Feb 2015.

Project Description: Sabic Gas wished to implement alarm management solution as per Enterprise Guidelines.

Project Contribution: As alarm management consultant, together with the customer, I created an alarm philosophy document which matched the Sabic Enterprise Guidelines, but still fitted to the Sabic Gas way of working. Once the alarm philosophy document was created, we used it in several alarm rationalization sessions.

P1000096 small

Team doing Alarm Rationalization

 

 

{slider Client: Saudi Aramco, Kingdom of Saudi Arabia.}

Project: Jazan Refinery and Marine Terminal Project

Role: Advanced Solutions (MES) Consultant

Duration: April 2014 – March 2015.

Project Description: Saudi Aramco construct a 400 MBD grassroots refinery and hydrocarbon terminal facilities within JAZAN Economic City (JEC), Saudi Arabia.

JAZAN Refinery will be a semi-conversion refinery that processes 400 MBD of crude oil of either 100% Arabian Medium crude or a mixture of 50/50 AM/Arabian Heavy crudes.

In addition, the refinery will upgrade 45 MBD of Jeddah Refinery intermediate feed stocks (Naphtha, Distillate, and Vacuum Gas Oil) to high quality finished products.

Project Contribution: Honeywell has been selected as the main automation vendor for the Jazan Refinery and Marine Terminal Project. My role within this project was to assure a consistent MES solution was provided throughout the project through an integrated approach of the various “Advanced Solutions” packages. (like: OSIsoft PI, Honeywell Alarm & Operations Management, Honeywell Asset Management, Honeywell Field Advisor, Honeywell On-line Refinery Instruction Manual System, Honeywell Procedural Operations). The consistent MES solution approach was achieved by defining the overall system architecture, clearly describing the interfaces to the various systems, like SAP, GECOS and LIMS. Aligning the MES solutions presented by the various project teams to the systems architecture and to create a consistent MES approach and presentation and as such assuring the flow of information across all MES applications.

Project: Alarm Management Solution

Role: Alarm Management Consultant

Duration: Mar 2014 – Aug 2015.

Project Description: Noretyl wished to implement Alarm Management and selected Honeywell to deliver this solution, including Alarm Management Consultancy

Project Contribution: As Alarm Management Consultant I investigate the problem, create an Alarm Philosophy, designed the solution, lead the implementation of the solution, trained the Noretyl personnel and performed various Alarm Rationalization sessions with the customer using the Alarm Management tools.

 

snowy Noretyl

 

 

 

Project: Gas Directorate Central Control Room Project

Role: Advanced Solutions (MES) Consultant

Duration: Dec 2012 – Mar 2014

Project Description: To better management the Gas distribution network within Oman, PDO decided to create a Central Control Room for the Gas Distribution Network. Honeywell was awarded as main automation vendor. The project included Alarm & Operations Management and Gas network management solutions.

Project Contribution: As an Advanced Solutions Consultant I have worked with the customer and the local team to define the configuration of the Alarm & Operations Management solution and the Gas Network Management solution to create a solution which fits to the PDO way of working. Based on the customer configuration, the system architecture was defined, including all interfaces to various other systems, like SAP, OSIsoft PI, LIMS. Based on the system architecture, the defined interfaces and the agreed configuration, the local team implemented the solutions.

See also this YouTube video to get an impression of the PDO GNOC project. https://www.youtube.com/watch?v=agCuxh-iKeU

I am proud to have contributed to this project. 

 

 

Project: YASREF Integrated Refinery Information System (IRIS) Project

Role: Advanced Solutions (MES) Consultant

Duration: June 2013 – March 2014.

Project Description: Saudi Aramco and Sinopec constructed a full-conversion world class refinery that produces 400,000 barrels per day. The Refinery is located in Yanbu Industrial City along the Red Sea, on the west coast of Saudi Arabia.

The Refinery processes Arabian Heavy crude to produce high–quality refined products that meet the most stringent global product specifications. The Refinery benefits from the availability of the Arabian Heavy crude oil supply while utilizing the excellent facilities and infrastructure of the Yanbu industrial city.

The project objectives were to implement various applications to support the refinery operations maintenance & engineering processes and integrate the different applications to enhance the workflow processes.

Project Contribution: Accenture had been selected as the main automation vendor for the YASREF Integrated Refinery Information System (IRIS) Project. My role within this project was to assure a consistent MES solution was provided throughout the project through an integrated approach of the various “Advanced Solutions” (MES) packages. (like Honeywell Alarm & Operations Management and Honeywell Blending and Movement Automation solutions). The consistent MES solution approach was achieved by defining the overall system architecture, clearly describing the interfaces to the various systems, like SAP, LIMS, Data Historian, Oil Movement and Mass & Production Balance systems. Aligning the MES solutions presented by the various project teams to this systems architecture and to create a consistent approach and presentation and as such assuring the flow of information across all applications.

YASREF at Night

 

Project: Alarm Rationalization Workshop

Role: Alarm Management Consultant

Duration: Nov 2013 – Nov 2013.

Project Description: ADCO was suffering from a very high number of alarms. They installed a PAS Alarm Management Solution, but needed extra consultancy support. Honeywell was asked to provide this consultancy support.

Project Contribution: As Alarm Management Consultant I performed Alarm Rationalization Workshops for a week, investigate the problem, identified Bad Actors and as such eliminated up to 92% of the Bad Actor Alarms, reducing the Alarm load significantly.

 

 

Project: Alarm & Operations Management Implementation

Role: Alarm & Operations Management Consultant

Duration: Sep-2011 – Aug 2012 and Oct 2013 – Mar 2014

Project Description: Reliance Industry Limited (RIL) wants to implement the Integrated Operations Management Business Process (IOM) as part of the STAR (Smart Transformations at Reliance) program. RIL has selected the Operations Management Software suite OM Pro from Honeywell as the tool suite to support the IOM Business Process. In 2012 a total of 7 downstream manufacturing sites were implemented. In 2014 the upstream facility of RIL was implemented.

Project Contribution: As an OM Pro Consultant I have worked with the customer and the local team to define the configuration of the OM Pro Software suite to match RIL way of working. From the configuration, the system architecture could be defined, including all interfaces to various other systems, like SAP, GECOS, LIMS. The interface to SAP was crucial for the success of the project. Based on the system architecture and the defined interfaces, the overall project approach and plan was defined. I helped with the OM Pro implementation for the pilot site at RIL Jamnagar Refinery and conducted several training sessions.

 

Samen met het Team bij Reliance Dahej.
Team at Reliance Dahej

 

 

 

Project: Alarm Management System

Role: Advanced Solutions Consultant

Duration: Feb 2013 – Aug 2015

Project Description: Bayer Material Science has implemented the Matrikon Alarm Management Solution at all its operational facilities worldwide. As Matrikon was acquired by Honeywell, the Matrikon Alarm Management Services were integrated into the existing Honeywell Alarm Management service team. 

Project Contribution: As an Advanced Solutions Consultant and Team Manager, I have worked with my team to assure that BMS was provided the proper level of services as per existing SLA. In this context the main challenge was bringing the customer from an "Ad-Hoc" based service approach to a multi tier helpdesk service approach. 

 

 

 

Project: Alarm Management System

Role: Advanced Solutions Consultant

Duration: Feb 2013 – Aug 2015

Project Description: BASF has implemented the Matrikon Alarm Management Solution at all its operational facilities in Germany and Belgium. As Matrikon was acquired by Honeywell, the Matrikon Alarm Management Services were integrated into the existing Honeywell Alarm Management service team. 

Project Contribution: As an Advanced Solutions Consultant and Team Manager, I have worked with my team to assure that BMS was provided the proper level of services as per existing SLA. In this context the main challenge was bringing the customer from an "Ad-Hoc" based service approach to a multi tier helpdesk service approach. 

 

{slider Client: Sonatrach, Algeria.}

Project: PIMS/MES for LNG, Arzew, Algeria

Role: Advanced Solutions Consultant

Duration: Sep 2010 – Aug 2011.

Project Description: Sonatrach, Algeria wanted to expand its capacity in the LNG plant in Arzew, (West Algeria). Honeywell was awarded as main automation vendor.

The Advanced Solution scope was: Honeywell Data Historian, Honeywell Production Balance, Honeywell KPI Manager, Honeywell LIMS and Honeywell Capacity and Distribution Planner solution.

Project Contribution: As Advanced Solution Consultant and Advanced Solution team manager I have worked with my team to define, configure and implement the various software solutions for the project.

 

 

Project: Control Room Consolidation Project

Role: Advanced Solutions Consultant

Duration: Jan 2010 – Aug 2011.

Project Description: ExxonMobil Production GmbH decided to consolidate 8 regional control rooms into one (1) central control room. Honeywell was awarded as main automation vendor. The Advanced Solution scope included: consolidation of various existing data historians into one central Honeywell PHD based data historian, various existing MES reports coming from divers and partly very old systems, to be converted to the Honeywell Data Historian solution PHD and implementation of Alarm Management solution.

Project Contribution: As Advanced Solution Consultant and Advanced Solution team manager I have worked with my team to define, configure and implement the various software solutions for the Control Room Consolidation project.

 

 

Project: GAME-ESP

Role: Project Manager

Duration: Jul-2007 – Aug 2009.

Project Description: As part of the Operational Excellence initiative GAME (Global Asset Manufacturing Excellence) within Shell Downstream, Honeywell implemented the Alarm & Operations Management Solution OM Pro, as part of the ESP (Ensure Safe Production) program, within Shell Downstream globally.

Project Contribution: As Project Manager I was hired in by Shell to deploy the Honeywell OM Pro Solution to all Downstream facilities in Europe. Working with the local Shell facilities across Europe, to clarify the scope of the deployment, agree on the time line, organise the team and implement the solution on-site in an efficient and consistent manner.

 

 

Project: Various luxury yachts

Role: Project Manager / Team Manager Marine Automation

Duration: Feb-2004 – Jun-2007

Project Description: Alewijnse Marine Systems was awarded the total electrical installation on board of a range of luxury yachts. The Total Vessel Automation system was part of the scope.

Project Contribution: As Project Manager and Team Manager I worked with my team to provide the Total Vessel Automation Systems as per requirements for the specific yachts. The Total Vessel Automation system had to be Class approved and included the control of the Engines, the Power Distribution, the Hydraulic Systems, as well as complete Audio and Video Entertainment systems.

   MV Amevi on the dry      

            MY Amevi on the dry                                            ...... and in the wet.

 

 

Project: Various dredging ships

Role: Project Manager / Team Manager Marine Automation

Duration: Dec-2005 – Jun-2007

Project Description: Alewijnse Marine Systems was awarded the Dredging Vessel Automation system for various dredging ships, either new builds or upgrades.

Project Contribution: As Project Manager and Team Manager I worked with my team to provide the Dredging Vessel Automation systems as per requirements for the specific dredging ships. The Dredging Vessel Automation system had to be Class approved and included the control of the Engines, the Power Distribution, the Hydraulic Systems and the loading and unloading of the dredging vessel.

Jan de Nul dredger "Alexander von Humboldt" in the Westerschelde

 

 

Project: Various heavy Lift ships

Role: Project Manager / Team Manager Marine Automation

Duration: Feb-2004 – Jun-2007

Project Description: Alewijnse Marine Systems was awarded the total electrical installation on board of a range of commercial heavy lift ships. The Total Vessel Automation system was part of the scope.

Project Contribution: As Project Manager and Team Manager I worked with my team to provide the Total Vessel Automation Systems as per requirements for the specific heavy lift ships. The Total Vessel Automation system had to be Class approved and included the control of the Engines, the Power Distribution, the Hydraulic Systems.

Jumbo Javelin lifting a fishingboat.

See also this YouTube video to get an impression of the Heavy Lift Ship.

I am always impressed and proud to have worked on this project. 

https://www.youtube.com/watch?v=5TfY6NEMSHQ

 

 

 

Project: MES System consultancy.

Role: MES Consultant

Duration: March-2003 – November 2003

Project Description: HACTL (Hong Kong Air Cargo Terminal Ltd.) The logistic system at the Hong Kong airport was due for an upgrade. The existing support team at HACTL was struggling to design a future prove system and needed support in defining the business case.

Project Contribution: As MES Consultant I worked with the HACTL team to define a clear business case for the upgrade and designed a future proof concept for their logistic system at the Hong Kong airport.

 

 

 

Project: Document Management and CAE / CAD Services

Role: Service Manager / Team Manager Document Management and CAE / CAD Services

Duration: August-2001 – January-2003

Project Description: Providing Document management and CAE / CAD Services to the various AKZO Nobel locations, including the pharmaceutical affiliates Organon and Intervet.

Project Contribution: As Service Manager and Team Manager I worked with my team to provide the tier 2 and 3 support, performed system upgrades and maintained the Document Management and CAE / CAD systems.